Waterfront Architect Pierce County
Hiring an Architect for a Waterfront Home in Pierce County
The short answer: Hire a Washington-licensed architect, not an unlicensed designer, who has taken waterfront homes through Pierce County shoreline review, and have them analyze your site before they design anything. On the water, the shoreline buffer, critical areas and the status of your existing house decide what you can build. A pretty plan that ignores them can't be permitted, however good it looks.
What makes a waterfront project different?
Everything near the water in unincorporated Pierce County falls under the County's Shoreline Master Program. It's the local version of the state Shoreline Management Act, and it works together with the County's critical areas rules. Inside the City of Gig Harbor, the city's own shoreline program applies instead.
What are Critical Areas?
Critical Areas include wetlands, flood zones, fish and wildlife areas, and steep slopes to name a few. Public records show approximations of where these zones overlap your property. But it is the Pierce County Planning Department that makes the final say in what has to be done if your property is flagged for any critical area. Critical areas can limit what and where you can build. How far back you have to build depends on how your stretch of shoreline is designated, and on whether a habitat buffer overlaps it. Where two buffers apply, the County uses the more restrictive one.
Many older waterfront homes sit closer to the water than today's rules allow. That usually means you can keep and maintain the house, but how much you can expand it, and whether you can tear down and rebuild in the same spot, are real questions. They need answers before design, not after.
Do I need a shoreline permit?
Almost certainly some kind of shoreline review. Certain single-family work can qualify for an exemption from the full Shoreline Substantial Development Permit. Exemptions are read narrowly, though, and the burden is on you to show you qualify.
One detail catches people. If any part of a project isn't eligible for the exemption, the whole project needs the permit. And an exempt project still has to meet every shoreline rule. It just skips one step of the process. Certain things, like building an ADU, while allowed as of right in most places, are not eligible for exemption reviews.
How long does shoreline review take?
The County publishes target decision times: about 65 days for an exemption, 100 days for a Substantial Development Permit, and 170 days for a Conditional Use Permit. Those are review clocks. They don't count the time to prepare the application, answer corrections or line up consultant reports. The actual time it takes is much longer given all the people at the county it goes through.
On a waterfront addition, I tell clients to plan for up to nine months of shoreline approval. That's why I design to a settled schematic, pause for the shoreline application, and only then finish the drawings. That way, we are streamlining our way towards permits, and not waiting six months for one last approval.
What should I ask an architect before I hire them?
Ask when they last took a project through Pierce County shoreline review, and how it went. Ask who prepares and submits the permit application. In my practice I do, because I drew it.
Ask how they find out what your site allows before design starts, and which consultants they expect you'll need. Then ask who you'll actually work with, and whether they stay on through construction. A waterfront project is the wrong place to discover your architect hands you off to someone you've never met.
Which consultants does a waterfront project need?
Usually a surveyor who can locate the ordinary high water mark, and a geotechnical engineer, especially on a bluff or slope. Often a a septic designer, a structural engineer, and a wetland or habitat biologist. Sometimes a specialist who does cultural resources studies will be needed.
These are billed separately by each consultant. It took me years to build a bench I trust here, so I put the list in one place: the Pierce County Waterfront Consultant Guide.
Where do I start?
With a Site Validation. It's a fixed-fee study, with rates set for remodels and for new construction, that tells you what your site allows, where the shoreline and critical area lines fall, what it will realistically cost, and what each of you actually wants from the house. You get a written report you can use with me or anyone else.
If you're weighing a waterfront remodel or a new home on the water, start with a conversation. We'll figure out whether a Site Validation is the right first step.
Andrew Mikhael, Architect